Thursday, 24 October 2013
Risk Assessment
Risk Assessment
During the process of creating this portfolio, there are certain
risks all of our team needs to be aware of, particularly throughout the filming
process. To make sure these risks have been clearly identified to everyone, I
have created this table, which clearly shows the main risks and how the team
can overcome the risk, which could prevent filming and hold our team back.
Main Risks:
Weather / Lighting
Injury / illness
Broken Equipment / Low Battery
Props / Costume
Electrics / Trip Hazards
Location
|
Risk
|
How We
Will Prevent The Risk
|
|
Weather
|
Weather may affect our time
lapse on the day of shooting as we need to see the sunrise and sun set in
order to show the start and end of the day and create a clear narrative to
video. Lighting will mainly affect our studio shots as if we do not get the
lighting right whilst filming, it may affect the quality of the final clips.
Since our video is meant to be quite dark in the studio shots, if the
lighting is not correct it may give a false impression, which would totally
contrast our storyboard for the video and this will affect the meaning of the
video. To make sure that we can overcome this risk, if it happens to arise,
we will spend the first 5 – 10 minutes of our filming time adjusting the lighting
in order to make sure we have explored each possibility.
|
|
Lighting
|
|
|
Injury
|
Injury or illness could affect
our production at any of the shots. This is because if one member of the team
cannot make it to the shots due to illness, we will be one person down.
Especially in the studio, which is very busy, it may be hard to get another
available slot. Even though illness cannot be helped, we will make sure that
everyone in the team clearly knows the date and times of filming, so they
will be able to try an get better so the slots are not missed. We will also
try and organize substitutes just in case a member of team is really bad and
some one has to fill in for them.
|
|
Illness
|
|
|
Broken Equipment
|
This could potentially affect
the filming at any time as if we have a problem with the equipment (Tripod,
Cameras), or if we have a problem with the battery on the cameras, we may not
be able to film and this could hold us back. To ensure that we don’t encounter
any of these two problems, we will make sure that all of the cameras we are
using are charged up the night before and so they have enough charge to last
the time we need them for. We will also arrive at the filming studio 15
minutes before we start filming, as then we will be able to set up and check
all of the equipment. If there is a problem, we will then have enough time to
change the equipment before we start the filming time.
|
|
Low Battery
|
|
|
Electrics
|
This will mainly affect our
filming in the studio. This is because is there is a problem with electrics;
it could cause faults with the equipment, which could prevent us using the
equipment and therefore filming. It could also cause injury to a member of
the team, which could also prevent us filming. Trip Hazards would also be a
major risk whilst in the filming studio as the wires will all be plugged in
to sockets on the wall. This will mean wires will have to be left on the
floor. However, to ensure that there are no injury’s, we will make sure that
everybody involved in the process keeps all of the studio tidy so that all
wires are kept out of the way. We will also make sure that everybody involved
knows where the wires are and which wire goes to what piece of equipment.
This will make sure that everyone is aware of the hazards and they are then
able to prevent the hazards.
|
|
Trip Hazards
|
|
|
Location
|
Location will also be another
factor, which could contribute to the prevention of our production. If the
locations we have decided to use are temporarily unavailable (Temporary
Maintenance Working etc.) this could also postpone our filming, as we may have
to decide on other locations. The locations we have chosen outside of the
studios may also have a lot of hazards within the area, which could also
affect our filming process. To make sure that we avoid these location, which
could prevent our filming, we have taken recce shots of each of the possible
locations and made a sensible decision as to which location will be the best,
in terms of the video but also safety.
|
Call Sheet
G324 Advanced Portfolio in Media
Music Video (Call Sheet)
|
TRACK
|
ARTIST
|
GENRE
|
LENGTH
|
|
Still Life
|
The Horrors
|
Alternative Rock
|
Approx. 5 Minutes
|
|
DIRECTOR
|
PRODUCERS
|
LOCATION
|
SHOOT DATE
|
|
Richard Parker
|
Adam Dixon
|
Seaton Carew Front
|
Saturday 26th October 2013
|
|
Josh Newton
|
|||
|
LOCATION
|
|||
|
Seaton Carew Front
The Front, Seaton Carew,
Hartlepool, TS25
|
|||
|
CAST/CREW
|
ROLE
|
CALL TIME
|
WARDROBE
|
|
Richard Parker
|
Director / Band Member / Camera Man
|
9:00 am
|
Smart Casual
|
|
|
|||
|
Adam Dixon
|
Producer / Band Member / Camera Man
|
9:00 am
|
Smart Causal
|
|
|
|||
|
Josh Newton
|
Producer / Band Member / Camera Man
|
9:00 am
|
Smart Casual
|
|
|
|||
|
EQUIPMENT
|
PROPS
|
||
|
Camera
Camera Bag
Tripod
Remote Control
Intervalometer
|
N\A
|
||
Call Sheet
G324 Advanced Portfolio in Media
Music Video (Call Sheet)
|
TRACK
|
ARTIST
|
GENRE
|
LENGTH
|
|
Still Life
|
The Horrors
|
Alternative Rock
|
Approx. 5 Minutes
|
|
DIRECTOR
|
PRODUCERS
|
LOCATION
|
SHOOT DATE
|
|
Richard Parker
|
Adam Dixon
|
Studio
|
Friday 25th October 2013
|
|
Josh Newton
|
|||
|
LOCATION
|
|||
|
Hartlepool Sixth Form College
Brinkburn, Blakelock Road
Hartlepool, TS25 5PF
|
|||
|
CAST/CREW
|
ROLE
|
CALL TIME
|
WARDROBE
|
|
Richard Parker
|
Director / Band Member / Camera Man
|
1:50 – 3:20 pm
|
Smart Casual
|
|
|
|||
|
Adam Dixon
|
Producer / Band Member / Camera Man
|
1:50 – 3:20 pm
|
Smart Causal
|
|
|
|||
|
Josh Newton
|
Producer / Band Member / Camera Man
|
1:50 – 3:20 pm
|
Smart Casual
|
|
|
|||
|
EQUIPMENT
|
PROPS
|
||
|
Camera
Camera Bag
Tripod
|
3 Microphone Stands
3 Microphones
1 Drum Kit
2 Guitars
3 Spotlights
1 Camera Crane
|
||